Site approval

Get a new site approvedwith the noise report in hand.

Describe the site and its equipment once. OpenCycle models the sound at every nearby residence and gives you the report your regulator reviews in minutes, before you commit to a design.

Why it stalls

Noise holds up new sites
when it comes last.

  • Residences turn up late

    A house nobody marked appears after the design is set, and the work starts again.

  • Data lives in handoffs

    Site details, equipment and residences move between your team and a consultant in emails and spreadsheets.

  • Every change means a rerun

    Move a compressor or change the drilling plan, and the numbers wait on another round of work.

Testimonial · Energy and resources

The OpenCycle platform has become an essential tool for our operational agility. Whenever drilling plans change, we no longer have to scramble — we just log in and instantly access an updated NIA report. The efficiency gains across the entire planning process have been significant for our whole team.

Spur Petroleum

Spur Petroleum

Energy and resources

How it works

From site to report

  1. 01

    Describe the site

    Place the site and add its equipment from the catalogue, existing and proposed.

    → Site and equipment
  2. 02

    Confirm the residences

    Vision suggests possible residences around the site. You confirm each one on the map.

    → Residences
  3. 03

    Model the sound

    Predict works out the level at each residence and compares it with the permissible sound level.

    → Predicted levels
  4. 04

    Get the report

    A noise impact assessment with the sound map, each residence's result and the next steps.

    → Report

What you receive

The report your regulator reviews

Pages from a sample noise impact assessment on a sample compressor station.

  • The cover of a sample noise impact assessment

    The cover names the site, the report and who it was prepared for.

  • A sound map with the predicted levels around the site and each residence

    The sound map shows the predicted levels around the site and each residence.

  • A table of each residence's predicted level against its permissible sound level

    Each residence's predicted level against its limit, with and without proposed equipment.

Intelligence

The work done for you

Intelligence finds the residences around your site, models the sound at each one and keeps your next steps in view, so your team checks the work instead of building it.

  • Predict

    Live

    Predict the sound at every residence

    Models the sound from your site's equipment at each nearby residence with ISO 9613-2 propagation, and compares it with the permissible sound level of the regulator that applies.

  • Vision

    Live

    Find the residences around your site

    Suggests possible residences from building footprints traced from satellite imagery. You check each one on the map before it counts.

  • Advisor

    Live

    Answers where you work

    Ask from the search bar or from a site, deployment, phase or opportunity page. Advisor answers from your team's records, the regulations and our knowledge, shows its sources and links the records, and sums up the items that need your attention. On the Enterprise plan.

Who does the work

Automated, or validated by an engineer

  • Intelligence

    Automated

    Intelligence runs the model and writes the report. No engineer reviews it, so it is not stamped.

    • Run it yourself on the platform, or we run it for you
    • Rerun it when the design changes
    • Best for screening and early design
  • Expertise team

    Engineer-validated

    An engineer on an Expertise team reviews the model and the report, then validates and stamps it.

    • A stamped report to file
    • The same model and data, checked by a person
    • Best for the report you submit

Questions

Site approval

Keep exploring

See the platform
on a real site.

30 minutes is all it takes. We'll walk a real site through prediction and auditing and leave you with a sample report.