Reports
The report your regulator reads,for every stage of a site.
Regulator-grade reports on demand: desktop reports before you build, measured compliance once you run. Every report follows the same order, with its method and sources in the appendices.



The lifecycle
One report
for each stage.
01
Risk planning
A quick desktop check tells you whether the site needs a full assessment.
→ Screening NIA02
Design
The full model of the site and its neighbours, judged against the regulator's criteria.
→ Noise Impact Assessment03
Mitigation
When a site is over the limit, an Expertise team works through the options with you.
→ Options04
Validation
Monitors measure the site in operation and judge every interval against the limit.
→ Comprehensive Compliance Assessment
The reports
Each one answers
one question.




Screening Noise Impact Assessment
Does this site need a full assessment?
A quick desktop check of a site against the permissible sound level, for planning, a regulatory filing or an addition.


Noise Impact Assessment
Will the site meet its limit at every residence?
The full desktop model of an industrial or energy site and its neighbours, with the predicted level at each residence judged against the regulator's criteria.
Learn more
Traffic Noise Impact Assessment
What will a road or rail corridor sound like?
Road or rail noise modelled from traffic volumes, speeds and truck share, and judged against traffic criteria.


Comprehensive Compliance Assessment
Is the running site within its limit?
Monitors at the fence line and at a residence, every interval read against the operating log and the weather, with complaint calls beside the levels.
Learn more
Every report
Built the same way,
every time.
One section order
The findings first, then appendices for the context, data, environment, method, results, sources and glossary.
Drafted by Intelligence
The summary, discussion, conclusion and next steps are drafted from the results, and the report says so in its AI disclosure.
Stamped when it counts
Add engineer validation, and an engineer reviews and stamps the report before it goes out.
The next step named
A report over its limit names what comes next, from what drives the worst residence.