Reports

The report your regulator reads,for every stage of a site.

Regulator-grade reports on demand: desktop reports before you build, measured compliance once you run. Every report follows the same order, with its method and sources in the appendices.

The lifecycle

One report
for each stage.

  1. 01

    Risk planning

    A quick desktop check tells you whether the site needs a full assessment.

    → Screening NIA
  2. 02

    Design

    The full model of the site and its neighbours, judged against the regulator's criteria.

    → Noise Impact Assessment
  3. 03

    Mitigation

    When a site is over the limit, an Expertise team works through the options with you.

    → Options
  4. 04

    Validation

    Monitors measure the site in operation and judge every interval against the limit.

    → Comprehensive Compliance Assessment

The reports

Each one answers
one question.

  • Screening Noise Impact Assessment

    Does this site need a full assessment?

    A quick desktop check of a site against the permissible sound level, for planning, a regulatory filing or an addition.

  • Noise Impact Assessment

    Will the site meet its limit at every residence?

    The full desktop model of an industrial or energy site and its neighbours, with the predicted level at each residence judged against the regulator's criteria.

    Learn more
  • Traffic Noise Impact Assessment

    What will a road or rail corridor sound like?

    Road or rail noise modelled from traffic volumes, speeds and truck share, and judged against traffic criteria.

  • Comprehensive Compliance Assessment

    Is the running site within its limit?

    Monitors at the fence line and at a residence, every interval read against the operating log and the weather, with complaint calls beside the levels.

    Learn more

Every report

Built the same way,
every time.

  • One section order

    The findings first, then appendices for the context, data, environment, method, results, sources and glossary.

  • Drafted by Intelligence

    The summary, discussion, conclusion and next steps are drafted from the results, and the report says so in its AI disclosure.

  • Stamped when it counts

    Add engineer validation, and an engineer reviews and stamps the report before it goes out.

  • The next step named

    A report over its limit names what comes next, from what drives the worst residence.

Keep exploring

See the platform
on a real site.

30 minutes is all it takes. We'll walk a real site through prediction and auditing and leave you with a sample report.